All documentation requires a CAC to access.

  • Flying Squirrel Brochure (pdf)
  • Orb-weaver Installation Guide (doc)
  • FS DOD UC APL Approval memo (pdf)
  • DISA Communications Roadmap to Support the Department of Defense (pdf)
  • Flying Squirrel CONOPS v1.8 (doc)
  • Flying Squirrel Authority to Operate (ATO) (pdf)
  • Flying Squirrel Authority to Operate (ATO) - Amendment 1 (link coming soon)
  • Flying Squirrel Authority to Operate (ATO) - Amendment 2 (pdf)
  • Flying Squirrel Authority to Operate (ATO) extension - 15 August 2015 (pdf)
  • Flying Squirrel Authority to Operate (ATO) extension - 3 August 2016 (pdf)
    • (2017: The Risk Management Framework (RFM) certification process categorize Flying Squirrel, the wireless discovery application, as an IA Tool. Therefore, the Authorized to Operate (ATO) under the legacy certification and accreditation process is no longer applicable for Flying Squirrel. Flying Squirrel will be treated like any other application, e.g. Microsoft Word.)
  • Flying Squirrel Change Control Board Charter (pdf)
  • Flying Squirrel Configuration Change Request (CCR) Form (pdf)
  • Woodchuck - NASA World Wind
    • Lessons Learned Using NASA World Wind in Woodchuck (pdf)
    • Finding and Using Government-Owned Imagery for DoD users (pdf)
  • MeerCat-FS User's Manual (pdf)
  • MeerCat-FS Post-Hoc Analysis Training (pdf)
  • Flying Squirrel DCO Session (wmv)
  • Caribou Setup Instructions (pdf)
  • Flying Fox - FAQ (pdf)
  • EPIQ FlyingFox Flyer (pdf)